Sectional Point Repair
* Please Check Our Reference Letter Especially in wastewater lines using treatment systems, in cases where ground water, rain water, salt water or chemicals enter, the load of the treatment plant rises to much higher levels than planned. In rainy periods, when the ground water level increases or water inlets in lines near the sea cause the treatment plant to always operate at the highest performance.This situation leaves the administration that operates the facility to deal with very difficult situations because of its costs; In addition, the entrances of tree roots also cause clogging of the line and breakages and collapses. - Electricity costs, -Maintenance costs of pumps, - Chemical bacteria costs, - Personnel costs, - Foreign dependency costs, - Repairing unsuitable lines, etc., In cases where water ingress is suspected, PH measurements from the canal and treatment plant are sufficient to detect the ingress. However, in order to detect the entry points, the line must be viewed with channel imaging robots. Root entrances are completely prevented with partial rehabilitation after the roots are shaved with milling robots on the lines where tree roots are detected. Repair material prepared in European standards is applied under a certain pressure with special equipment to the points determined after imaging. The applied chemical must be mixed in a suitable amount for the weather conditions outside.. The curing time varies between 1.5 hours and 2 hours depending on the ambient temperature. Since the applications are generally exposed to external pressure, it increases the risk of water leakage. Our company does not manufacture outside the European standard sizes. The curing time varies between 1.5 hours and 2 hours depending on the ambient temperature. Since the applications are generally exposed to external pressure, it increases the risk of water leakage. Our company does not manufacture outside the European standard sizes. After the water inlets in the line are repaired with partial rehabilitation, there is a serious decrease in operating costs. If the mixture is not made under suitable conditions and with a professional team, the operation becomes very risky. The material can freeze on the packer and in the pipe, it can slide, get stuck at any point and block the line. As a result, a burdensome excavation may be required at the point where repairs are required without excavation. Under normal conditions, partial rehabilitation costs much less in terms of material and time when the excavation risk and cost are calculated. Since the day it was founded, our company has carried out thousands of applications and projects in different sizes all over Turkey, Georgia, Iran and Azerbaijan. All of the applications are carried out with our expert staff and equipment working in our company. In particular, there are no companies in Turkey that have very serious experience in 400mm, 500mm, 600mm, 700mm, 800mm and 1000mm partial rehabilitation except our company, and these applications are very risky applications if the experienced team and the necessary equipment are not used.

















